EasyManua.ls Logo

Xylem Sontek River Surveyor RS5 - Page 86

Xylem Sontek River Surveyor RS5
149 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SonTek RS5 User Manual (August 2020) 86
Figure 64. Loop Measurement Dialog
6. When approaching the far channel bank, do not spend any extra time along the
edge. Rather, gently turn the boat and return to the starting stream bank.
7. After returning to the starting position, press the Finish button (or use [F5]) to
stop the Loop measurement.
8. The results of the Loop measurement will be displayed automatically (shown in
Figure 65).

Table of Contents

Related product manuals