EasyManuals Logo
Home>Xylem>Measuring Instruments>Sontek River Surveyor RS5

Xylem Sontek River Surveyor RS5 User Manual

Xylem Sontek River Surveyor RS5
149 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #64 background imageLoading...
Page #64 background image
SonTek RS5 User Manual (August 2020) 64
7.4. Starting a Moving Boat Measurement
Once the RS5 is connected in the RSQ software, click the New Data Collection button
(Figure 38). Click the Moving Boat button. The Stationary option will be coming soon.
Figure 38. New Data Collection
7.5. Smart Page (Pre-measurement Setup and Checks)
The RSQ Smart Page (top portion shown in Figure 39) is the landing page where a
measurement starts. It guides the user through the proper steps for pre-measurement
tests and setup that should occur prior to each discharge measurement to ensure both
the functionality of the RS5 hardware for proper data collection as well as proper
configuration of setup parameters. Each section is described in detail in the following
sections.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Xylem Sontek River Surveyor RS5 and is the answer not in the manual?

Xylem Sontek River Surveyor RS5 Specifications

General IconGeneral
BrandXylem
ModelSontek River Surveyor RS5
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals