EasyManua.ls Logo

YASKAWA FSDrive-MV1000 - Test Run with Load Connected

YASKAWA FSDrive-MV1000
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
102 YASKAWA ELECTRIC EZZ010928 FSDrive-MV1000 Instructions
4.8 Test Run with Load Connected
4.8 Test Run with Load Connected
Test Run with the Load Connected
After performing a no-load test run, connect the motor and proceed to run the motor and load together.
Notes on Connected Machinery
Clear the area around the motor.
The motor should come to a complete stop without problems.
Fasten all installation screws properly. Check that the motor and connected machinery are held in place.
Checklist Before Running Machinery
Confirm that the Fast Stop circuit or mechanical safety measures operate correctly.
Be ready to press in case of emergency.
Checklist Before Operation
Confirm that the motor should rotate in the proper direction.
Confirm that the motor acceleration and deceleration should produce smooth machine operation.
Operating the Motor under Loaded Conditions
Test run the application similarly to the no-load test procedure when connecting the machinery to the motor.
Watch monitor parameter U1-03 during operation to ensure there is no overcurrent.
If the application permits running the load in the reverse direction, try changing motor direction and the frequency
reference while watching for abnormal motor oscillation or vibration.
Correct any problems that occur with hunting, oscillation, or other control-related issues.

Table of Contents

Other manuals for YASKAWA FSDrive-MV1000

Related product manuals