Mechanical installation
Contents of this chapter
This chapter describes alternatives of the mechanical installation of the drive module. It
refers to the installation example chapters which contain instructions that depend on the
selected drive configuration.
Examining the installation site
The material below the drive must be non-flammable and strong enough to carry the weight
of the drive.
See section Ambient conditions (page 195) for the allowed ambient conditions and section
Losses, cooling data and noise (page 190) for the required cooling air.
Moving and unpacking
WARNING!
Obey the safety instructions of the drive. If you ignore them, injury or death,
or damage to the equipment can occur.
Move the transport package by pallet truck to the installation site.
To unpack the package:
Cut the straps.
Lift the lid.
Lift the sleeve.
Unpack the top boxes (drive module package).
Insert lifting hooks to the drive and LCL filter module lifting lugs and lift the modules to
the installation place.