HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 3 of 128
Version control
HVC 450 kW E-Bus Charger Installation Guide
Temporary version for customer. Document is still under construction.
Update numbering of the glass fiber cable and X4 connector block in
ACM. Conversion from m/mm to ft/Inch, Nm to ft-lb and kg to lb. Changed
PE to GND, and RCD to GFCI. Name Bus-bar Box changed in Junction
Box. Update cable list. Description added for own making pole foundation.
Numbering change of connector X4 in the ACM. Handling instructions for
connecting the glass fiber cable in ACM adapted.
First commercial release.
Height specification HVC 150 adapted. Adapt instruction for GND
connection in Power Cabinet. Removed UL Listing logo on page 112 and
put 2202 after UL in the table in 8.4.
Correct description Interlock connection within salve 1 HVC150S (Mantis
PR10833). Remove sub-paragraph “Cables” and add cable specification
list. Update contact information.