HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 53 of 128
7. For the DC power cables, make sure that a cable length of 39.37 Inch is available above
the surface for internal routing in the cabinet.
8. For the other cables, make sure that a cable length of 118.11 Inch is available above the
surface for internal routing in the cabinet.
5.3. Unpack Power Cabinet
5.3.1. Before unpacking
Preconditions:
All construction work is completed.
The product is delivered by a transport company at the confirmed date of delivery.
1. Make sure that the Power Cabinet has not been shaken or tilted over 30.