HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2 COMPANY CONFIDENTIAL
Date released: 16-08-2018 Page 72 of 128
DC+ (marked by red heat-shrink),
DC-.
6. Tighten the nuts (C) with a tightening torque of 22.13 ft-lb.
5.7.3. Install the protection covers
1. Take the 2 protection covers that was removed in Remove the protection covers on Page
71.
2. Place the protection covers (B) back on the connector blocks (A).
5.8. Connect AC utility power, Interlock and CAN cables Power Cabinet