EasyManua.ls Logo

ABB IRB 120 - Page 130

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
xx0900000857
Remove cable guide.11
Parts:
A: Attachment screws (2 pcs)
B: Cable guide
Removing the cable harness in the base
InformationAction
CAUTION
Always cut the paint with a knife and grind
the paint edge when disassembling parts
of a Clean Room robot! See Replacing parts
on the robot on page 118
1
The picture will be good help when assem-
bling the bracket again.
xx1500000001
If the cable harness is being reused:
Take a picture of the bracket (from
the wrist) mounted on the harness
Place a cable tie close to the bracket
Cut old cable ties
2
Remove the bracket (from the wrist) on the
cable harness.
3
Tighten the screw after removal of bracket.4
Guide the cable harness and pull it carefully
in below motor in axis 2.
5
Tip
Take a picture of cable harness placement
in the swing housing before removal.
6
Continues on next page
130 Product manual - IRB 120
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.3.1 Removing the cable harness
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals