EasyManua.ls Logo

ABB IRB 6700 Series - Page 413

ABB IRB 6700 Series
846 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Remove the lifting accessory from the
lower arm.
8
Preparations before refitting the upper arm
NoteAction
Wipe clean all contact surfaces.1
Rust preventive: 3HAC034903-001 (Mer-
casol 3110 Waxcoat. Recommended drying
time is 24h.)
xx1700001880
Foundry Plus:
Apply Mercasol on the surface on the lower
arm as shown in the figure.
CAUTION
Keep the sealing surfaces clean from Mer-
casol.
2
Guide pin, M12x150: 3HAC13056-2IRB 6700 - 235/2.65, IRB 6700 - 205/2.80,
IRB 6700 - 175/3.05, IRB 6700 - 150/3.20
3
Guide pin, M12x200: 3HAC13056-4
Fit two guide pins in opposite M12 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
Always use guide pins in pairs.
xx1700000058
Continues on next page
Product manual - IRB 6700 413
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.5.5 Replacing the lower arm
Continued

Table of Contents

Related product manuals