EasyManua.ls Logo

ABB IRB 760 Series - Page 156

ABB IRB 760 Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteArt.no.Equipment, etc.
These procedures include refer-
ences to the tools required.
-Other tools and proced-
ures may be required. See
references to these proced-
ures in the step-by-step in-
structions below.
See Circuit diagrams on page 395.-Circuit diagram
Removing the cable harness - lower end (axes 1-3)
Use this procedure to remove the cable harness, lower end (axes 1-3).
NoteAction
This is done in order to facilitate updat-
ing of the revolution counter.
Move the robot to the calibration position.1
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
2
xx1000001313
Remove the rear cover plate from the robot by
removing its attachment screws.
3
Shown in Location of cable harness -
lower end (axes 1-3) on page 154.
Disconnect the earth cable.4
See the figure Location of cable har-
ness - lower end (axes 1-3) on
page 154.
Disconnect the connectors R1.MP and R1.SMB.5
Continues on next page
156 Product manual - IRB 760
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.3.1 Replacing cable harness, lower end (axes 1-3)
Continued

Table of Contents

Related product manuals