EasyManua.ls Logo

ABB IRB 760 Series - Page 237

ABB IRB 760 Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1000001252
If the upper link arm is removed, secure the
link with a roundsling in a crane. Use the
hole in the middle of the link.
2
This is done in order to prevent the link
from moving if both the upper link arm
and lower link arm are removed.
xx1000001251
Remove the lock nuts and support washers
that hold the lower link arm at each end.
Note
The support washers can stick to the grease
and can easily be forgotten and lost when
removing the lock nuts.
3
CAUTION
The link weighs 23 kg.
All lifting accessories used must be sized
accordingly!
4
Continues on next page
Product manual - IRB 760 237
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.5 Replacing the linkage - lower link arm
Continued

Table of Contents

Related product manuals