4 Inspection and transport
4.1 Transport the EVSE to the site
A transport company delivers the EVSE close to the site. The movement of the EVSE
to its final location is your responsibility.
If you need to store the EVSE before installation, obey the ambient conditions
for storage. Refer to section 10.8.
4.2 Unpacking
4.2.1 Unpacking procedure
Preliminary requirements
Installation engineer
Procedure
1. Do a check on the transport sensors. Refer to section 4.2.2.
2. Remove the packaging material.
3. Discard the packaging material. Refer to section 2.11.
4. Do a visual check for damage on the outside and inside of the EVSE.
5. Make sure that all parts are delivered according to the order. Refer to the order
and section 10.3.
6. If you find damage or the parts are not according to the order, contact the local
representative of the manufacturer.
7. Remove the border covers. Refer to section 8.3.
8. Remove the cabinet from the pallet. Refer to section 4.2.3.
4.2.2 Do a check on the transport sensors
Preliminary requirements
Installation engineer
Inspection and transport