• Installation engineer • Swivel eye bolts or bolts
with lifting loops. Refer to
section 10.6.
Warning:
Risk of pinching or crushing, the cabinet is heavy
• Make sure that the hoisting equipment can lift the cabinet safely.
Obey the safety instructions that apply to the hoisting equipment.
Take into account the dimensions, the mass and the center of gravity
of the EVSE. Refer to chapter 10.
Caution:
• Do not drop the cabinet.
• Do not tilt the cabinet more than allowed. Refer to section 10.4.
• Make sure there are no dynamic forces on the hoisting points.
Procedure
1. Install the swivel eye bolts or bolts
with lifting loops (A).
2. Connect the cables (B) of the hoisting
equipment to the swivel eye bolts or
bolts with lifting loops.
3. Move the cabinet to the correct
location.
4.3.2 Move the cabinet with a forklift truck
Preliminary requirements
• The cabinet is unpacked.
Refer to section 4.2.
• Forklift truck. Refer to
section 10.5.
• Installation engineer
Warning:
Risk of pinching or crushing, the cabinet is heavy
• Make sure that the forklift truck can lift the cabinet safely. Obey the
safety instructions that apply to the forklift truck. Take into account
the mass, the dimensions and the center of gravity of the EVSE. Refer
to chapter 10.
Caution:
• Do not drop the cabinet.
• Do not tilt the cabinet more than allowed. Refer to section 10.4.