EasyManua.ls Logo

ABB Terra 124 - Page 7

ABB Terra 124
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.3.3 Prepare a standard prefabricated foundation................................................. 44
5.4 Replace the standard base with an alternative base....................................................... 45
5.4.1 Remove the EVSE from the base......................................................................... 46
5.4.2 Install a base with side entrance......................................................................... 46
5.4.3 Install a base with reduced height.......................................................................47
5.5 Mechanical installation...........................................................................................................47
5.5.1 Mechanical installation procedure...................................................................... 47
5.5.2 Open the cable inlet and remove the cable gland............................................48
5.5.3 Guide the cables through the opening in the cable guide plate................... 48
5.5.4 Install the cabinet on the foundation................................................................. 48
5.6 Electrical installation.............................................................................................................. 49
5.6.1 Electrical installation procedure..........................................................................49
5.6.2 Connect the PE wire............................................................................................... 49
5.6.3 Connect the enclosure to the earth.................................................................... 50
5.6.4 Connect the AC input wires...................................................................................51
5.6.5 Connect the Ethernet cable...................................................................................51
5.7 Tilt sensors installation (option).......................................................................................... 52
5.7.1 General procedure.................................................................................................. 52
5.7.2 Install the bracket of the tilt sensors..................................................................52
5.7.3 Install the tilt sensors.............................................................................................53
5.7.4 Connect the tilt sensors........................................................................................ 53
5.7.5 Install a ferrule on a wire....................................................................................... 54
5.7.6 Connect a wire that has a ferrule.........................................................................54
5.8 Cable management system installation (option)............................................................. 55
5.8.1 Prepare the cable management system.............................................................55
5.8.2 Mount the clamp..................................................................................................... 56
5.8.3 Install the cable management system................................................................56
5.9 Prepare for commissioning...................................................................................................56
6 Operation........................................................................................... 58
6.1 Prepare before use..................................................................................................................58
6.2 Stop the EVSE if there is an emergency..............................................................................58
6.3 Reset the EVSE after an emergency.................................................................................... 59
6.4 Charge session.........................................................................................................................59
6.4.1 Charge an EV............................................................................................................59
6.4.2 Start a charge session........................................................................................... 59
6.4.3 Stop a charge session............................................................................................60
6.5 Energize the EVSE................................................................................................................... 60
6.6 De-energize the EVSE............................................................................................................. 60
6.6.1 De-energize the EVSE - general procedure........................................................60
6.6.2 Measure the AC voltage......................................................................................... 61
6.6.3 Measure the DC voltage......................................................................................... 61
6.7 Remove condensation from the cabinet............................................................................ 62
6.8 Local service portal operations............................................................................................ 63
Contents
9AKK108466A3703-EN | 001 5

Table of Contents

Other manuals for ABB Terra 124

Related product manuals