5.3.3 Prepare a standard prefabricated foundation................................................. 44
5.4 Replace the standard base with an alternative base....................................................... 45
5.4.1 Remove the EVSE from the base......................................................................... 46
5.4.2 Install a base with side entrance......................................................................... 46
5.4.3 Install a base with reduced height.......................................................................47
5.5 Mechanical installation...........................................................................................................47
5.5.1 Mechanical installation procedure...................................................................... 47
5.5.2 Open the cable inlet and remove the cable gland............................................48
5.5.3 Guide the cables through the opening in the cable guide plate................... 48
5.5.4 Install the cabinet on the foundation................................................................. 48
5.6 Electrical installation.............................................................................................................. 49
5.6.1 Electrical installation procedure..........................................................................49
5.6.2 Connect the PE wire............................................................................................... 49
5.6.3 Connect the enclosure to the earth.................................................................... 50
5.6.4 Connect the AC input wires...................................................................................51
5.6.5 Connect the Ethernet cable...................................................................................51
5.7 Tilt sensors installation (option).......................................................................................... 52
5.7.1 General procedure.................................................................................................. 52
5.7.2 Install the bracket of the tilt sensors..................................................................52
5.7.3 Install the tilt sensors.............................................................................................53
5.7.4 Connect the tilt sensors........................................................................................ 53
5.7.5 Install a ferrule on a wire....................................................................................... 54
5.7.6 Connect a wire that has a ferrule.........................................................................54
5.8 Cable management system installation (option)............................................................. 55
5.8.1 Prepare the cable management system.............................................................55
5.8.2 Mount the clamp..................................................................................................... 56
5.8.3 Install the cable management system................................................................56
5.9 Prepare for commissioning...................................................................................................56
6 Operation........................................................................................... 58
6.1 Prepare before use..................................................................................................................58
6.2 Stop the EVSE if there is an emergency..............................................................................58
6.3 Reset the EVSE after an emergency.................................................................................... 59
6.4 Charge session.........................................................................................................................59
6.4.1 Charge an EV............................................................................................................59
6.4.2 Start a charge session........................................................................................... 59
6.4.3 Stop a charge session............................................................................................60
6.5 Energize the EVSE................................................................................................................... 60
6.6 De-energize the EVSE............................................................................................................. 60
6.6.1 De-energize the EVSE - general procedure........................................................60
6.6.2 Measure the AC voltage......................................................................................... 61
6.6.3 Measure the DC voltage......................................................................................... 61
6.7 Remove condensation from the cabinet............................................................................ 62
6.8 Local service portal operations............................................................................................ 63
Contents
9AKK108466A3703-EN | 001 5