EasyManua.ls Logo

Agilent Technologies 7890B - GC Component Keys

Agilent Technologies 7890B
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the GC 1
Agilent 7890B Installation 25
fitting on the GC. Take into account any traps or tees you will
need.
2 Cut the tubing to length with a tubing cutter (Figure 5).
Figure 5 Typical tubing cutter
3 Connect the tubing to the gas source with a Swagelok fitting.
See Appendix A, “Making Swagelok Connections.
Install traps
1 Determine where you will install the traps in your supply
tubing line. Figure 6 shows the recommended trap order for
the carrier gas and the recommended locations for On/Off
valves. See also the Site Preparation Guide.
Figure 6 Plumbing the gas supplies
2 Cut the tubing to length with a tubing cutter.
Cutting wheel
Good cut
Tank valve
Gas supply
Two-stage regulator
Gas Clean Filter
system
On/Off valve
On/Off valve

Table of Contents

Other manuals for Agilent Technologies 7890B

Related product manuals