EasyManua.ls Logo

Agilent Technologies 7890B - Step 20. When the System Stabilizes, Run One Injection

Agilent Technologies 7890B
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
68 Agilent 7890B Installation
1 Installing the GC
Step 20. When the system stabilizes, run one injection
Perform the checkout procedure as described in
"Chromatographic Checkout" in the Operation Manual.
1 Enter the parameters for the checkout procedure.
• If using an Agilent data system, use it to create a checkout
method.
• If not using a data system, enter the setpoints using the
GC keyboard.
See the following topics in the Operation Manual for the
parameters for your detector:
• FID checkout
• FPD
+
checkout
• FPD
+
checkout (Japan)
• NPD checkout
• TCD checkout
• μECD checkout
2 When the GC becomes Ready (Not ready light turns off), make
the injection and start the run.
• For an ALS injection, press [Start] on the GC or in the data
system, as appropriate.
• For a manual injection, inject the sample and press [Start].

Table of Contents

Other manuals for Agilent Technologies 7890B

Related product manuals