64 Agilent 7890B Installation
1 Installing the GC
Step 17. Cool the detector and complete column installation
1 Locate the installation instructions for the column and
detector you will use. See the Maintaining Your GC manual.
Refer to the section for your specific detector type.
• FID
• TCD
• NPD
• μECD
• FPD+
2 Connect the free end of the checkout column to the detector,
as described in Maintaining Your GC.