70 Agilent 7890B Installation
1 Installing the GC
Prepare for the Next Analysis
After evaluating the GC under the checkout conditions,
installation checkout is complete. The next step is to prepare
the GC for your next analysis. Be sure to cool the GC before
making changes. See the 7890 Series Maintaining Your GC
manual and the 7890 Series Operation Manual.
Install the appropriate inlet hardware (can include septum,
liner, liner-O-ring, inlet gold seal, inserts, and so on).
Install the appropriate detector hardware (wavelength filter
for FPD
+
, jet for FID or NPD).
Change to any alternate gas sources as needed for the new
analysis.
Install the desired column and condition it per the
manufacturer’s recommendations.
Configure the GC to match any hardware or gas type changes
(columns, liners, carrier or makeup gas types, and so on).
Load or create the desired method.

Table of Contents

Other manuals for Agilent Technologies 7890B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 7890B and is the answer not in the manual?

Agilent Technologies 7890B Specifications

General IconGeneral
BrandAgilent Technologies
Model7890B
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals