EasyManuals Logo

Agilent Technologies 7890B Installation And Startup

Agilent Technologies 7890B
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #26 background imageLoading...
Page #26 background image
26 Agilent 7890B Installation
1 Installing the GC
3
Connect the traps and tubing. On/Off valves are not
essential, but are very useful when a tank or trap must be
changed. (If purchasing Agilent compliance services, install
an on/off valve for each inlet gas supply.)
Supplied fittings
Every GC ships with pre-assembled Tee fittings appropriate for
the number and types of inlets and detectors. (Customers who
ordered the pre-plumbed option will receive additional supplies
and fitting assemblies.)
Plumb to EPC flow modules
Inlet and detector EPC flow modules are mounted very close
together across the back of the GC. See Figure 7.
Figure 7 Plumbing flow modules
G3430-60009 Detector Tee
assembly
G3430-20029 Inlet Tee assembly,
sized to accomodate two shutoff
valves (not supplied)
WARNING
Be sure to vent uncombusted hydrogen to a fume hood or other
safe location.

Table of Contents

Other manuals for Agilent Technologies 7890B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 7890B and is the answer not in the manual?

Agilent Technologies 7890B Specifications

General IconGeneral
BrandAgilent Technologies
Model7890B
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals