44 Agilent 7890B Installation
1 Installing the GC
Step 10. Install ALS, if ordered
If installing an ALS, install it now. Refer to its instructions.
Prepare the sampler for checkout. See the checkout procedures
and information in the Operation Manual.
1 Prepare a 2-mL screw-top sample vial.
2 Prepare 4-mL waste vials and place them into the turret.
3 Prepare fresh solvent solutions as needed for the checkout
sample for your detector type. Place the solvent vials into the
injector turret. For details on the solvent needed, see the
Operation Manual:
FID checkout
FPD
+
checkout
FPD
+
checkout (Japan)
NPD checkout
TCD checkout
μECD checkout

Table of Contents

Other manuals for Agilent Technologies 7890B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 7890B and is the answer not in the manual?

Agilent Technologies 7890B Specifications

General IconGeneral
BrandAgilent Technologies
Model7890B
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals