Installing the GC 1
Agilent 7890B Installation 31
Install hydrogen sensor calibration gas
If available, install the hydrogen sensor calibration gas. The
hydrogen sensor ship kit includes a pressure regulator that
installs directly onto the calibration gas cylinder. Agilent also
provides sufficient copper tubing and hardware to connect the
pressure regulator to the hydrogen sensor assembly calibration
gas input fitting.
1 Set the gas cylinder stand upright on the lab bench near the
GC. (Do not place it behind the oven exhaust vent!)
2 Turn the pressure regulator completely off and set the
output pressure as low as possible (full CCW).
1/8-inch Swagelok nut
and ferrule
1/8-inch copper tubing,
cut to length needed
To hydrogen sensor
LQSXWÀWWLQJ
Pressure regulator
Calibration gas
cylinder
Gas cylinder
stand
Pressure adjustment
On/Off
Tank pressure gage

Table of Contents

Other manuals for Agilent Technologies 7890B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 7890B and is the answer not in the manual?

Agilent Technologies 7890B Specifications

General IconGeneral
BrandAgilent Technologies
Model7890B
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals