32 Agilent 7890B Installation
1 Installing the GC
3
Install the pressure regulator onto the calibration gas
cylinder (it screws on).
4 Connect the calibration gas cylinder output tubing to the
hydrogen sensor module.
Use the tubing, nuts, and ferrules provided in the
hydrogen sensor kit.
See the figure under step 1.
5 Install the calibration gas cylinder into the stand and secure
using the screw.
6 Turn on the supply pressure at the pressure regulator. (You
will adjust it later.)
7 Check for leaks in the fittings using a leak detection fluid.
Correct any leaks.

Table of Contents

Other manuals for Agilent Technologies 7890B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 7890B and is the answer not in the manual?

Agilent Technologies 7890B Specifications

General IconGeneral
BrandAgilent Technologies
Model7890B
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals