4 Agilent 7890B Installation
Step 11. Connect the external cables 45
Back panel connectors 45
Connecting cables 48
Labeling BCD and EVENT cables 50
Configuring the GC IP address 50
GC / MS / Agilent data system / ALS 52
Additional cabling configurations 52
Step 12. Finish configuring communications 53
Configuring GC-MS communications (5977A, 7000C, 7010)
53
Configuring GC-MS communications (5877B) 56
Configuring GC-HS communications 56
Step 13. Calibrate the Hydrogen Sensor 58
Step 14. Configure the date/time, pressure units, and the checkout
column 59
Date and time 59
Pressure units 59
Checkout column 59
Step 15. Install the checkout column to the inlet and condition 61
Step 16. Bakeout the detector 63
Step 17. Cool the detector and complete column installation 64
Step 18. If appropriate, update firmware 65
GC firmware 65
PIDs 66
Step 19. Transfer the checkout sample to a screw-top sample vial 67
Step 20. When the system stabilizes, run one injection 68
Step 21. Evaluate Results 69
Prepare for the Next Analysis 70
A Making Swagelok Connections
Making Swagelok Connections 72
Using a Swagelok Tee 75