Remote login test
...................................................................................................................................................................................................................................
Overview
This test checks whether the management communication channel via the DCC bytes is
operational on the link.
Estimated duration
5 minutes.
Test setup
Establish a test setup similar to Figure 8-1, “Remote login test” (p. 8-4) .
Be sure that the MS DCC on the line ports of both nodes is set to
Enabled. For the
1643 AM/AMS node this is default.
(Go to menu: Management, Overlay Comms Network, DCC, select
LP1.1 MS, EDIT)
Remark: Node A is expected to be a 1643 AM/AMS node.
Procedure
Proceed as follows to test the DCC communication:
...................................................................................................................................................................................................
1
With the ITM-CIT login to node A.
...................................................................................................................................................................................................
2
Check whether you can see the remote node B on the DCC Neighbor list.
(Go to menu: File, NE Login, DCC Neighbors List, click OK.)
...................................................................................................................................................................................................
3
Do a remote login to node B, and watch the name of node B appear on top of the
ITM-CIT window. (Select
LPx.1, click Login, OK)
Figure 8-1 Remote login test