Table of Contents
6 KE/KX/KG (RIGID) BAH0089-7 02.2020
5.2.1
KE Special / Super rotary harrow .......................................................................................... 53
5.2.2 KX / KG Special / Super rotary cultivator .............................................................................. 54
5.2.3 Adapter frame Cat. 4 (optional) ............................................................................................. 54
5.2.4 Three-point hitch extension (option) ...................................................................................... 55
5.2.4.1 Three-point hitch extension for KE rotary harrows ................................................................ 55
5.2.4.2 Three-point extension cat. 2 for KX/KG rotary cultivators ..................................................... 56
5.2.4.3 Three-point extension cat. 3 for KX/KG rotary cultivators ..................................................... 57
5.3 Wheel mark eradicator (optional) .......................................................................................... 58
5.4 Rollers ................................................................................................................................... 59
5.4.1 Cage roller SW ...................................................................................................................... 60
5.4.2 Tooth packer roller PW ......................................................................................................... 61
5.4.3 Wedge ring roller KW ............................................................................................................ 61
5.4.4 KWM wedge ring roller with matrix tyre profile ...................................................................... 62
5.4.5 TRW trapeze ring roller ......................................................................................................... 62
5.5 Drive ...................................................................................................................................... 63
5.5.1 Gearbox / Tractor PTO shaft speed / Tine speed ................................................................. 64
5.5.2 WHG/KE Special / Super gearbox ........................................................................................ 65
5.5.3 Gearbox WHG/KX ................................................................................................................. 66
5.5.4 WHG/KG Special / Super gearbox ........................................................................................ 67
5.5.4.1 Oil cooler (optional) ............................................................................................................... 67
5.6 Universal joint shafts ............................................................................................................. 68
5.7 Electronic drive monitoring (optional, KG Super only) .......................................................... 70
5.8 Tool tines ............................................................................................................................... 72
5.8.1 Tool tine minimum length ...................................................................................................... 74
5.8.2 Stone release ........................................................................................................................ 74
5.9 Working depth of the soil tillage implement .......................................................................... 75
5.9.1 Mechanical adjustment ......................................................................................................... 75
5.9.2 Hydraulic adjustment (optional) ............................................................................................. 75
5.10 Side panel ............................................................................................................................. 76
5.10.1 Side panel, swivelling ............................................................................................................ 76
5.10.2 Side plate, with sliding and swivelling bearing ...................................................................... 76
5.10.3 Side panel, spring-mounted .................................................................................................. 77
5.11 Soil guiding angle bracket (optional) ..................................................................................... 77
5.12 Levelling board (optional) ...................................................................................................... 78
5.13 Operating tool ........................................................................................................................ 78
5.14 Combination possibilities with other AMAZONE implements ............................................... 79
5.14.1 Lifting frame ........................................................................................................................... 79
5.14.2 QuickLink ............................................................................................................................... 80
5.15 Working with an AMAZONE mounted seed drill ................................................................... 81
5.15.1 Coupling parts (optional) ....................................................................................................... 81
5.15.2 Lifting frame (optional) .......................................................................................................... 81
5.15.3 Lift height limiter (optional) .................................................................................................... 83
5.15.4 Side stabiliser for lifting frame 2.2 (optional) ......................................................................... 83
5.16 Shaft-mounted gearbox (optional) ......................................................................................... 84
5.17 Track markers (optional) ....................................................................................................... 85
5.18 GreenDrill 200-E / 200-H catch crop seeding unit (optional) ................................................ 86
6 Initial operation .......................................................................................... 87
6.1 Checking the suitability of the tractor .................................................................................... 88
6.1.1 Calculating the actual values for the total tractor weight, tractor axle loads and load
capacities, as well as the minimum ballast ........................................................................... 89
6.1.1.1 Data required for the calculation (attached implement) ........................................................ 90
6.1.1.2 Calculation of the required minimum ballasting at the front G
V min
of the tractor to ensure
steering capability .................................................................................................................. 91
6.1.1.3 Calculation of the actual front axle load of the tractor T
V tat
................................................... 91
6.1.1.4 Calculation of the actual total weight of the combined tractor and implement ...................... 91
6.1.1.5 Calculation of the actual rear axle load of the tractor T
H tat
................................................... 91
6.1.1.6 Tractor tyre load capacity ...................................................................................................... 91
6.1.1.7 Table ..................................................................................................................................... 92