n
Visually inspect the tension on the crawler tracks (E).
n
Check that the springs and dampeners move freely on the front wheel (F). Clean, if
necessary.
n
Check for loose screws and nuts.
16.5 Check Track Frames
!
NOTE: First oil change after 150 engine hours, then every 1500 engine hours. Flush
the gears with oil before new oil is added. Volume approximately 2 liters. The level plug
on the traction gear must be positioned at 9 o'clock in order to check the level of the oil.
n
Check for signs of leakage on the traction gears (A).
n
Pump grease into the two grease nipples (B).
n
Check for signs of leakage on the front wheel (C) and dampener.
n
Check the position of the dampener (D). If the slide block sticks out more than 50 mm
outside the frame, the chain must be replaced.
n
Tighten all mountings after 50 engine hours and then every 250 engine hours.

Table of Contents

Other manuals for Atlas Copco FlexiROC T30 R

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Atlas Copco FlexiROC T30 R and is the answer not in the manual?

Atlas Copco FlexiROC T30 R Specifications

General IconGeneral
BrandAtlas Copco
ModelFlexiROC T30 R
CategoryConstruction Equipment
LanguageEnglish

Related product manuals