Operating Instructions Xenotest
®
150 S+
6.1 Initial start-up
NOTE - Initial start-up:
The initial start-up must be performed only by the ATLAS MTT
Technical Service or by an authorized service company.
During the initial start-up, all functional units of the instrument are
checked for their correct functions and operability.
The instrument is commissioned in an operational state; the com-
missioning is documented in the commissioning log at the end of
these instructions.
6.2 Checking the instrument components
WARNING - Electric shock!
Contact with voltage-carrying components may cause a lethal
electric shock.
Before checking the instrument components, disconnect the in-
strument from the power supply system!
Switch the instrument off using the ON/OFF switch.
Disconnect the mains plug from the socket and protect it from acci-
dental reconnection.
Check to see if the instrument is de-energized.
Only instrument components that are in perfect condition ensure the operational safe-
ty of the Xenotest
®
150 S+.
Prior to any start-up or test run, check the instrument components and functional units
listed below for possible damage and operability. Do not use damaged or worn com-
ponents.
Checklist:
The following functional units must be checked prior to any start-up.
Correct combination of light filters,
CAUTION - Overheating!
Apart from the light filtering, the light filters are also used for ab-
sorbing heat. If tests are conducted without light filters, the instru-
ment may overheat and the samples may be damaged.
Ignite the xenon lamps only when light filters are employed.
number of xenon lamp operating hours,
condition of the air filters for lamp cooling and test chamber cooling,