Arrivals / Approaches / Landing 6-3
Once the descent has begun, the Vertical Speed Required (VSR)
cue on the Vertical Speed Indicator (VSI) can be used.
VSR Green Diamond
COOL FEATURE
Vertical Speed Required When a vertical
constraint has been added to the flight plan for the
next leg, a green VSR cue is drawn on the VSI. By
matching the actual VSI with the VSR, you can be
assured of meeting the entered vertical constraint.
COOL FEATURE
Enter Approaches for Multiple “Destinations”
The FMS will allow multiple airfields or destinations
to be built into the flight plan. Each can have the
published approach and missed approach as part of
the plan. This is useful in pre-building your primary
destination with a missed approach, expected
alternate and its published approach. Similarly, a
training flight with multiple intended approaches and
locations can all be created in a single flight plan,
before takeoff.