EasyManua.ls Logo

Barco DP2K-E series

Barco DP2K-E series
163 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14. Preventative maintenance actions
14.2 3 month maintenance actions
MAINTENANCE TYPE B (perform every three months)
The 3 mo nth maintenance actions, listed below, may be perform ed by a trained projectionist who is familiar
with potential hazards associated with the product.
No. Maintenance a ction Remarks
1
Clean the back air outlet vents of the lam p modules and L amp Powe r Supply
(LPS).
Dust the vents using a vacuum cleaner
with br ush attachment.
2
Clean the housing of your projector.
Remove excess dus t on and around
the projector covers. See cleaning
instructions in this manual.
3
Verify the internal c lock of the ICMP with real time clock. Correct if needed. ICMP version 1.2.1 is required.
Comm unicator version 5.0 is required.
See user guide of C omm unicator for
detailed instructions.
4
Check the lamp module compartment and lamp fan for dust. Clean if necessary. Use a vacuum
cleaner with brush attachment to
remove dust.
R5906693 DP2K-E SERIES 19/06/2015 109

Table of Contents

Other manuals for Barco DP2K-E series

Related product manuals