5. Removal and Replacement of Major Components and Modules
5-47
• Before beginning any Removal and Replacement procedure(s):
o FMS2000 Circuit Breaker should be switched OFF and unplug the unit
from the wall outlet
• After any Removal and Replacement certain components or module(s), FMS
system parameters setting, calibration, and/or operational check should be
performed, see Chapter 6 and 7.
• Drawings and Bills of Material (BOM’s) are included.
• Proper ESD precautions are required for all electronic assemblies.
REQUIRED MATERIAL & TOOLS
1. Pliers, needle-nosed
2. Screwdriver, #2 Phillips head
3. Allen Wrench, 3/32
4. IC Removal Tool
5. Kapton Tape
6. Teflon Grease or equivalent
7. RTV sealant, Dow Corning 732 silicone or equivalent
REMOVAL AND REPLACEMENT OF
MAJOR COMPONENTS AND MODULES