EasyManua.ls Logo

Bend-Tech Dragon A400 - Bearing and Ring Gear Installation

Bend-Tech Dragon A400
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.6.12 Air Line Connection
The air line connection for the machine is located in the bottom central portion of the Control
Box cover. It consists of:
Air compressor connection
Engraver and Material Support Lift Connections
Air Solenoid
Engraver mechanism
The air line that will feed the Dragon A400 Engraver and Material Support Lift should be
connected to the ttings located near the center of the Control Box. Ensure all air lines and air
line ttings are tight and leak-free.
1.6.13 Laser Cord
The Laser Cord plugs into the Control Box just below the air line assembly tting. The Laser
Cord has a red plastic identication tting on the wire connection to identify it. Assure the Laser
Cord is seated in its connection.
1.6.14 Tool Connections
The tool connections for the Dragon A400 are located at the bottom right of the Control Box.
The Engraver uses the left hand connection, the Torch uses the center connection. The Torch
cable should run to the Torch power supply.
20 Bend-Tech Dragon A400
Start-Up and Training
Setup Inspection
01

Table of Contents

Other manuals for Bend-Tech Dragon A400

Related product manuals