01
Setup Inspection
1.1 General Overview
After assembling the Dragon A400 it is important to conduct an initial inspection of components
to ensure proper setup. An improperly assembled machine can create numerous problems
once it comes time to power up the machine and begin operation.
This chapter is set up as a procedural. Following this procedure will ensure the Dragon A400 is
set up properly before it is powered up for operation.
It is often the case that a aw in the operation of the machine is the result of improper
setup. Initial inspection is critical to eliminating setup variables in the troubleshooting
process.
! Caution !
It is important to inspect the machine before it is powered up. Handling electrical
ttings can cause injury to the Operator. Always inspect electrical connections while
the machine is powered down, preferably disconnected from power sources.
7Bend-Tech Dragon A400
Start-Up and Training
Setup Inspection
01