EasyManua.ls Logo

Bend-Tech Dragon A400 - Gate Component Modifications

Bend-Tech Dragon A400
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15Bend-Tech Dragon A400
Assembly Manual
Beginning Assembly
03
03
Beginning Assembly
3.1 Shipping Crate
The Dragon A400 is shipped from the Bend-Tech manufacturing facility in a custom-fabricated

ensure the protection of the Dragon A400 during shipping. The Dragon A400 machine is
completely secured within the shipping crate for shipping purposes. Components may be
bolted to the crate, shrink wrapped or secured with plastic or metal banding. The order in which
components are uncrated is important in executing proper assembly of the machine. For best
results in assembling the Dragon A400, follow the steps outlined in this Assembly Manual.
3.1.1 Dragon A400 Shop Position
Before beginning assembly of the Dragon A400, ensure there is adequate space to

Bend-Tech website, www.bend-tech.com, or dimensions can be obtained by contacting Bend-
Tech sales and support: sales@bend-tech.com.
3.2 Crate Disassembly
Tools Needed
Cordless Driver
T25 Bit

Table of Contents

Other manuals for Bend-Tech Dragon A400

Related product manuals