3.3.2 Application example intensive care unit
ATICS-2-63A-ISO: Changeover between
the preferred and redundant line while
monitoring the medical IT system with
transformer load and temperature
monitoring
EDS151: Insulation fault locator for fast
insulation fault location (recommend-
ed)
ATICS-BP: Bypass switch for uninter-
rupted test/maintenance (recommend-
ed)
MK2430/MK800/TM800/CP9xx: Alarm
at at least two points with independent
power supplies for functional safety
3.4 ATICS® tasks
The ATICS® automatic transfer switching and
monitoring device has the following tasks:
Two-pole changeover of the power supply
Voltage monitoring of the preferred supply (line 1)
Voltage monitoring of the second supply (line 2)
Voltage monitoring at the automatic transfer switching device output (line 3)
Monitoring of the changeover switch for correct switch position
Internal functional testing, including checking the switching times
Monitoring of the insulation resistance in the IT system
Monitoring of the IT system transformer load current
Monitoring of the IT system transformer temperature
Communication with remote MK... alarm indicator and test combinations, and with TM… or
CP9xx… alarm indicator and operator panels via BMS bus
Option for adjusting the time delay for the changeover process according to DIN VDE 0100-
710
(VDE 0100 Part 710)
Possible field of application in systems according to DIN VDE 0100-710 (VDE 0100 Part 710)
with a changeover period ≤ 15 s or even ≤ 0.5 s
U
1
U
2
U
3
I
3
I
L
R
ISO
T
ATiCS-2-63A-ISO
ATiCS-BP
ϑ
2 2 2 222
EDS151
BMS
MK
MK
Distribution group 2
Nurse desk Intensive care
Second
supply line
Preferred
supply line

Table of Contents