56 ATICS-2-ISO_D00046_04_M_XXEN / 03.2021
Operation
1. Save Saves the date of last changeover as test date, as long as that date is later than
the previous entry.
2. Cancel Return to test menu "Last switch"
After saving, the date on which the next test is due is increased by the test interval (in this case, 6
months).
The date of the test is saved in the test logger to send a reminder for the next test once the test interval
has elapsed. A changeover period is not saved. The messages from this test are also stored in the histo-
ry memory.
6.2.3.5 Checking the ATICS-ES energy storage device (if available)
I
CheCk with isolator after bypass tap upstream of ATICS® feed!
Before each test, observe the LEDs on the ATICS-ES and wait until the energy storage device is fully
charged. 3 tests required:
a) Line 1 off, then line 2 off --> ATICS® must switch to position 0
b) Line 2 off, then line 1 off --> ATICS® must switch to position 0
c) Automatic test with both lines available
6.2.3.6 Test menu 5: Generator
Executing this function makes sense only when a generator is connected to the redundant line and the
corresponding settings have been carried out (see chapter „7.3.4.1 Settings menu 1: Changeover“ on
page 67). To avoid voltage interruptions, in the test menu "Generator", the ATICS® does not switch to
the redundant line. In order to test the generator and the changeover switch, select "Autom. changeo-
ver" or "Manual changeover".
Generator Generator start relay is switched. The generator starts. However, there is no
changeover to the redundant line. The test is not terminated and the generator
switched off again until the "RESET" button has been pressed.
Cancel Return to test menu
Save
Cancel
Save
Last switch
1. Date: 20.09.18
2. Test: 21.03.19
Save
Generator
Cancel
Generator