5. Commissioning and testing
The following flow chart explains the commissioning process:
1. Tests before switching on
2. Tests after switching on
3. Parameter setting
– Settings on the MK2430
– Settings using the software TMK-SET
4. Tests after parameter setting
Please write down all settings and keep them with the equipment or instal-
lation documentation.
When setting the MK2430 with the configuration software TMK-SET, a
project file is created. Save this file. Create a backup copy of this file and
keep it in a safe place.