EasyManua.ls Logo

Bosch B9512G - Page 34

Bosch B9512G
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34 en | Control panel installation Control Panels
2016.06 | 08 | F.01U.303.996 Installation and System Reference Guide Bosch Security Systems, Inc.
SDI2 devices daisy chained with terminal wiring
RESETZONEX
TAMPER
SDI2
PWR+/R
A/Y
B/G
COM/B
PWR+/R
A/Y
B/G
COM/B
24
25
26
27
28
29
23
26
SDIx
ire
olice
ting
RESETZONEX
TAMPER
SDI2
PWR+/R
A/Y
B/G
COM/B
PWR+/R
A/Y
B/G
COM/B
25
26
28
29
30
23
27
SDIx
ire
olice
ting
24
ZONEX TMPR
SDIx SDI2
MODULE RELEASE
MOD-2
MOD-1
Using interconnect wiring
Interconnect wiring connectors parallel the SDI2 terminals (27 through 30 (or 23 through 26 if
configured for SDI2)). In installations with multiple SDI2 modules, using interconnect wiring
makes the installation quicker and easier than using terminal strip wiring. You use any
combination of terminal and interconnect wiring to wire multiple modules in parallel, but do
not wire a single module to the control panel using both terminal and interconnect wiring.
The interconnect wiring connectors are "keyed" (interconnect wiring plug can fit in only one
direction).

Table of Contents

Other manuals for Bosch B9512G

Related product manuals