13.4 Conduits
Checklist
Yes No n/a 4 Conduits Comments Scheduled
4.1
From computer cabinet to flat
panels.
4.2
From computer cabinet to IR cam-
era.
4.3
From computer cabinet to in-room
distribution box.
4.4
From computer cabinet to control-
room distribution box.
4.5
From computer cabinet to warning
lights.
4.6 From computer cabinet to linac.
4.7
From computer cabinet to X-ray
generators.
PREINSTALLATION CHECKLISTS
Site Planning Manual Rev. 1.0 ExacTrac Ver. 6.x 125