282 Brocade MLX Series and NetIron XMR Hardware Installation Guide
53-1002373-02
Installing a Brocade NetIron XMR 32000 router
4
Cable routing for the upper-left quadrant
Route cabling from slots in numerical order starting with the cables for slot #1.
1. Route cables for slots #1 and #2 directly to the left through the side comb. Refer to Figure 196.
FIGURE 196 Routing upper-left quadrant cables
1 Upper left quadrant 3 Cables from slot #1
2 Side combs (18) 4 Cables from slot #2