EasyManua.ls Logo

BT REFLEX RR B7-8C - Page 59

BT REFLEX RR B7-8C
514 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Valid from serial number T-code
713962- 403-414, 669-671, 716-718
Order number Date
218920-040 2005-09-09
© BT Europe AB Service Manual REFLEX RR B,E RR B,E CC 5- 5
Preventive maintenance – P2
Maintenance Schedule
U indicates what appears in the Daily Care and Function Checking
chapter and must be carried out by the driver.
X indicates what should be done during the various services. Other let-
ters indicate oil and grease quality
When points with longer time intervals are addressed, the points with
shorter time intervals should also be addressed unless otherwise stat
-
ed above.
7400.3 Check wearing strips and tilt angle on
the fork carriage.
X
9500 Extra equipment
9500.1 Check the fire extinguisher X
Table 4: Maintenance schedule RR B/E 1-8
Pos.
no.
Work to carry out
Interval in hours 5 20 250 500 1000 3000
Interval in days/weeks/months 1 d 1
wk
3 m 6 m 12 m 36 m
https://www.forkliftpdfmanuals.com/

Table of Contents

Related product manuals