EasyManua.ls Logo

CASE CONSTRUCTION CX17C - Hydraulic Breaker and Auger Operation

CASE CONSTRUCTION CX17C
240 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-ACCESSORIES
Operationwiththehydraulicbreaker
Thehydraulicbreakerisasingle-actinghydraulicattachment,andshallbeconnectedtotherstauxiliary(1-way)
hydrauliccircuit.
Therefore,tooperatewithahydraulicbreakerthemachineshallbeequippedwiththerstauxiliary(1-way)hydraulic
circuit.
Aftermakingsuretohavereadandunderstoodthe
installationproceduredescribedintheOperator’smanual
oftheattachment,proceedasfollows:
1.Makesurethatthemachineandtheattachmenttobe
installedareonatandlevelground.
2.Operatethecontrolsofboom,armandbucketinorder
toinstallthehydraulicbreakertothebucketlinkageat
thetopofthearm.
3.Stoptheengine.Releasepressureinsidetherstaux-
iliary(1-way)hydrauliccircuitasindicatedonpage
6-10.
4.Closethestopvalvesatthetopofthearm.Install
theconnectinghosesbetweentheattachmentandthe
stopvalves.
NOTICE:onthebreaker,makesuretoidentifythe
supplyport(INorP)andthereturnporttotank(OUT
orT).Thehoseforbreakersupplyshallalwaysbe
connectedtothestopvalveontheleft-handsideofthe
arm.Ifthesupplyportonthebreakerisnotalignedto
thestopvalveontheleft-handsideofthearm,check
foranalternativesetupofthehydraulicportsonthe
attachment.
NOTICE:alwayskeepeachconnectinghoseonthe
samesideofthearm.Nevercross-overtheconnect-
inghosesbetweenthetwosidesofthearm.
5.Openthestopvalvesandcheckthexingclampsfor
looseness,andthetubesandhosesttingsforleaks.
6.Starttheengine.Operatethecontrolsofboom,arm
andbucketinordertopositionthebreakerrighttothe
structureortotheobjecttobecrushed.
9-7

Table of Contents

Related product manuals