EasyManua.ls Logo

Case 445/M2 - PART TWO − ELECTRICAL EQUIPMENT

Case 445/M2
178 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 3 DUTY INDUSTRIAL APPLICATION
2
E NG I NE S
ED. FEBUARY 2003
Pagina
PART TWO ELECTRICAL EQUIPMENT 73
ELECTRICAL COMPONENT LAYAOUT (4 CYL.
ENGINES WITH ROTARY PUMP) 75
- Cooling liquid temperatur sensor 76
- Starter 76
- KSB water temperatur sensor 76
- Electromagnets assembled to feed pump 77
- Oil pressure switch 77
- Fuel filter 77
- Prepost heating resistor 78
- Alternator 78
ELECTRICAL COMPONENT LAYAOUT (6 CYL.
ENGINES WITH PUMP UNIT) 79
- Cooling liquid temperatur sensor 80
- Starter 80
- KSB water temperatur sensor 80
- Engine stop assembled to feed pump 81
- Oil pressure switch 81
- Fuel filters 81
- Prepost heating resistor 82
- Alternator 82
Pagina
PART THREE TROUBLESHOOTING 83
PART FOU R MAINTENANCE PLANNING 91
MAINTENANCE PLANNING 93
- Recovery 93
- Planning of controls and periodical intervention 93
- Checks not included in maintenance planning
daily c heck 94
MAINTENANCE PROCEDURES CHECKS
AND CONTROLS 94
- Engine oil level c heck 94
- Check of fuel system 95
- Cooling system c heck 95
- Lubricating system ch eck 95
- Check of water presence within fuel filter
or prefilter 95
- Check of drive belt tensioning 96
- Check of belt’s tear and wear status 96
- Check and setting of tapped clearance 96
- Oil motor and filter replacement 97
- Fuel filter replacement 98
- Alternator belt replacement 98

Table of Contents

Related product manuals