EasyManua.ls Logo

Chen Hsong CDC-2000 - Injection Setup

Default Icon
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1 Operational Manual
thickness setup position of
DDDD.D
press to move cursor to
,
then either press
to open or press to close, and push to
complete the correction, If mold adjustment needs to be stopped during the
procedure, push
.
C.b) After auto adjustment, have the molds put into clamping mechanism. Use
the mold fixing ring and the fixing hole of read platen to centralize the
mold which sit against and are stabilized to the read platen by mold clamp.
C.c) Switch menu (09) to menu (01); press
to have molds sit tight.
The molds should be in a closed state. Use mold clamps to stabilize molds
and remove mold hangers.
C.d) Mold has no clamping force.
D) Auto operation for clamping force:
Fixed the mold in the machine, and move the cursor to
EEEEE “ position to set the
clamping forces (ton) and presses
to complete a correction. To move the cursor to “
position, then either press
or to select
”open
“, and push to
complete the correction, and the display now displays “ AAAAAAAAAAAAAAAA “ which
is Auto clamping force adjustment “.
04/08/13
52

Table of Contents

Related product manuals