8-42
Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation Guide
OL-13208-11
Chapter 8 Cisco ASR 1002 Router Overview and Installation
Cisco ASR 1002 Router Power Supplies
Figure 8-32 shows the lead wire fully inserted.
Figure 8-32 Cisco ASR 1002 Router +24 VDC Power Supply Lead Wire Fully Inserted
Step 7
After the lead wire is fully inserted, hold the lead wire in place by pressing inward while you remove the
screwdriver to release the spring to tension down on the installed lead wire, then perform these steps:
a. Hold the lead wire in place while you are removing the screwdriver.
b. Once the screwdriver is completely removed, gently pull on the lead wire to make certain that the
lead wire is securely installed.
1 Fully-inserted lead wire — —
OUTPUT INPUT
FAIL
OK OK
FAN
This unit might have more than
one power supply connection.
All connections must be removed
to de-energize the unit.
+27V DC INPUT
+27V 32A
1
253168