EasyManua.ls Logo

Cisco Catalyst 3750 - Powering on the Switch

Cisco Catalyst 3750
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 1 Using Express Setup
Powering On the Switch
1-4
Catalyst 3750 Switch Hardware Installation Guide
78-15136-03
Powering On the Switch
Complete these steps to power on the switch:
Step 1 Connect one end of the AC power cord to the power connector on the switch rear
panel, as shown in Figure 1-3.
Figure 1-3 Connecting the Power
Step 2 Connect the other end of the power cable to a grounded AC outlet.
As the switch powers on, it begins the power-on self-test (POST), a series of tests
that runs automatically to ensure that the switch functions properly. POST lasts
approximately 1 minute.
1 Switch 2 AC power cord
97176
1
2
RATING
100-240V ~
1.2A-0>6A, 50-60 HZ
DC INPUTS FOR REMOTE
POWER SUPPLY
SPECIFIED IN MANUAL
+12v @13A
CONSOLE
STACK 1
STACK 2

Table of Contents

Other manuals for Cisco Catalyst 3750

Related product manuals