USER MANUAL FOR mPICO SERIES
Copyright - refer to title page
4 COMMISSIONING
4.1 PRE-COMMISSIONING TASKS
The equipment is easily commissioned, once the front cover is removed, programming of the equipment
can be done either by press the one click smart setup button or software commissioning via Micro-USB
interface.
4.2 LED INDICATORS
Three diagnostic LEDs are located on mPICO panel; each indicates the status of a particular function:
Table 6: mPICO LED
Operation indicator, flashes every second to indicate normal operation.
Power indicator. ON = power on; OFF = power off
Alarm indicator. ON = alarm; OFF = no alarm
4.3 COMMISSIONING PROCEDURES
Perform the following procedures for system commissioning.