CSC Combination Puller/Cutter UGE048/1103
5-4 MAINTENANCE
P
REVENTATIVE
MAINTENANCE
SCHEDULE
Daily
Checking puller belts for wear
If a belt shows sign of cracks, tears, or other damage,
replace it. See Replacing Belts, Section 5.
Checking puller belt tension
Check the belt tension. See Testing Belt Tension,
Section 5.
Checking belt gap
Check the belt gap. See Checking the Belt Gap,
Section 5.
Inspecting cutter blade(s)
Clean, sharpen or replace as needed. See Inspecting
the Cutter Blades, Section 5.
Inspecting the blade mounting hardware
Check the blade-securing bolt and the holding pins.
See Inspecting Blade Hardware, Section 5.
Inspecting cutter bushing screws
Check that the cutter bushing screws are secure. See
Inspecting the Cutter Bushing Screws, Section 5.
Checking the closure latch on the knife guard
See Checking the Closure Latch, Section 5.
Inspecting unit alignment
Proper alignment with other equipment on the line is
critical for optimum performance. Use a plumb line or
laser to check for a straight line from the extrusion die
to the cutter bushings.
Checking floor locks
See Checking Floor Locks, Section 5.
Weekly
Cleaning the blade lubrication tray See Cleaning the
Lubrication Tray, Section 5.
Lubricating shafts on slide rail system
See Lubricating the Slide Rail, Section 5.
Checking shafts and grease fittings
Lubricate all shafts and grease fittings as needed. See
Checking the Grease Locations, Section 5.
Continued