๎3.๎ If๎the๎cables๎cannot๎be๎securely๎fastened๎to๎the๎input๎terminal,๎the๎Terminal๎Block๎is๎damaged๎and๎
needs๎to๎be๎replaced.
4.11.1.3 Verifying the 3-Phase AC Input
๎1.๎ Turn๎ON๎the๎AC๎input๎power.
๎2.๎ Set๎the๎multimeter๎for๎AC๎voltage๎measurements.
๎3.๎ Place๎the๎meter๎probe๎on๎one๎phase๎of๎the๎AC๎input๎terminals๎and๎the๎other๎meter๎probe๎on๎another๎
phase๎of๎the๎AC๎input๎terminals๎as๎shown๎in๎Figure๎4-79๎๎Measuring๎the๎3-Phase๎AC๎Input๎Voltage๎on๎
the๎AC๎Input๎Terminals๎-๎TTS300/TGS230๎and๎Figure๎4-80๎๎Measuring๎3-Phase๎AC๎Input๎Voltage๎on๎AC๎
Input๎Terminals๎(TTS/TGS/TTH/TGH๎(Except๎TTS300/TGS230).๎Repeat๎for๎all๎AC๎input๎terminals.๎Repeat๎
on๎load๎side๎of๎the๎fuses๎(TT300/TG230๎only).
Figure 4-79 Measuring the 3-Phase AC Input Voltage on the AC Input Terminals - TTS300/TGS230
Figure 4-80 Measuring 3-Phase AC Input Voltage on AC Input Terminals (TTS/TGS/TTH/TGH (Except TTS300/TGS230)
๎4.๎ Verify๎that๎the๎meter๎shows๎the๎expected๎AC๎measurement๎within๎the๎range๎as๎indicated๎in๎Table๎4-18๎๎
Expected๎AC๎Voltage๎Range๎on๎page๎102.๎The๎acceptable๎AC๎input๎voltage๎range๎is๎+/-10%๎of๎the๎
nameplate๎AC๎input๎voltage.
๎5.๎ If๎the๎meter๎does๎not๎show๎any๎reading,๎it๎is๎possible๎there๎is๎no๎power๎from๎the๎AC๎source.๎Ensure๎the๎
AC๎power๎source๎is๎turned๎ON๎and๎try๎again.๎If๎there๎is๎no๎power๎on๎the๎load๎side๎of๎the๎fuses,๎isolate๎
the๎power๎and๎check๎the๎fuses.
๎6.๎ If๎the๎measured๎values๎correspond๎to๎the๎specified๎values๎for๎all๎phases,๎the๎AC๎input๎voltage๎is๎okay.
๎
๎
M-SV-001-EN Rev. H-1/23/2023 Page 101 of 294