If it is necessary to put the device out of operation for maintenance and/or storage,
please follow the instructions below.
8  De-Commissioning
WARNING !
To avoid injuries, please follow the procedures:
-  Switch off Manual Switch to shut down the inverter.
-  Switch off AC circuit breaker to disconnect with electricity grid.
-  Switch off the PV array switch to disconnect from the PV array.
-  Use proper voltmeter to confirm that the AC and DC power are disconnected
   from the unit.
-  Remove the AC wiring immediately to completely disconnect from electricity grid.
-  Remove the DC wiring to disconnect from PV Array.
-  Remove the communication module RS-485 connection from the computer
   connection.