Operation
50 M-Max Series Adjustable Frequency Drive    MN04020003E—October 2013    www.eaton.com
Operation
Commissioning Checklist
Before placing the frequency converter into operation, make sure to check the following:
No. Activity Completed Notes
1 Installation and wiring have been carried out in accordance 
with the corresponding instructional leaflet (AWA8230-2416)
2 All wiring and line section leftovers, as well as all the tools 
used, have been removed from the frequency inverter’s 
proximity
3 All terminals in the power section and in the control section 
were tightened with the specified torque
4 The lines connected to the output terminals of the frequency 
inverter (U/T1, V/T2, W/T3, R+, R–) are not short-circuited and 
are not connected to ground (PE)
5 The frequency inverter has been earthed properly (PE)
6 All electrical terminals in the power section (L1, L2/N, L3, 
U/T1, V/T2, W/T3, R+, R–, PE) were implemented properly and 
were designed in line with the corresponding requirements
7 Each single phase of the supply voltage (L1, L2, L3) is protected 
with disconnect device
8 The frequency inverter and the motor are adapted to the input 
voltage (see “Nameplate Rating Data”on Page 6, connection 
type [star, delta] of the motor tested)
9 The quality and volume of cooling air are in line with the 
environmental conditions required for the frequency inverter 
and the motor
10 All connected control lines comply with the corresponding stop 
conditions (for example, switch in OFF position and setpoint 
value = zero)
11 The parameters that were preset at the factory have been 
checked with the list of parameters (see “List of Parameters” 
on Page 161)
12 The effective direction of a coupled machine will allow the 
motor to start
13 All emergency switching off functions and safety functions are 
in an appropriate condition